EZ Shop
Brand New
Favorites
Clearance
Bestsellers
Designer Tools
News
Grant
FAQ
Corrections
Downloads
Article Archives
Site Map
Bead Shop
Catalogs
Coupons
Newsletters
Trend-E-Mails
Contact & About Us
Order Terms
International Terms
Términos y Condiciones
|
|
| |
Step 1: Cut beadalon into two equal lengths.
Step 2: Attach toggle with crimp tube to one end of each length of beadalon.
Step 3: String 14 AF14LG on each strand.
Step 4: Slide both strands through ISQ5S.
Step 5: Add 3 AF14LG to each strand.
Step 6: Repeat steps 4 & 5
Step 7: String 1 IS6S through both strands.
Step 8: String 3 B53016JO then another IS6S, repeat pattern.
Step 9: Repeat step 3.
Step 10: Attach other side of toggle.
|
|