| |
Step 1: Cut 24" of JW4913130.
Step 2: Take 1 SHP23 headpin and add 1 - B53014R, 1 - S1030, 1 - B53014R, 1 - BLM77
(Pink bead), 1 - B53014R, 1 - S1030, 1 - B53014R and wire wrap to middle bottom loop of S886
(triangle chandelier).
Step 3: Take 1 SHP23 headpin and add 1 - B53014R, 1 - S1030, 1 - BLM75 (Black bead),
1 - S1030, and 1 - B53014R.
Repeat. Wire wrap to right and left end bottom loops of S886 (triangle chandelier).
Step 4: Take 1 - SF072 eyepin and open loop and slip through top hole of the S886
(triangle chandelier), add 1 - B53014R and then gently close and create a wire wrapped
loop (cut off any additional wire).
Step 5: Slip beadalon through wire wrapped loop of eyepin and start stringing:
1 - TK198002 (capped curved tube), 1 - BLM77, 1 - TK198002, 1 - BLM75, 1 - TK198002,
1 - BLM77, 1 - TK198002, 1 - BLM75, 1 - TK198002, 1 - BLM77, 1 - TK198002, 1 - BLM77,
1 - TK198002, 1 - S1030, 1 - SCT1 (crimp tube).
Step 6: Repeat Step 5 on other side of the triangle chandelier.
Step 7: Slip 1 - S5903 (cable thimble) through each end hole of the S4158
(fancy hook clasp).
Step 8: Feed Beadalon through cable thimbles and back through the crimps,
and the S1030s and back through a tube if will go through.
Step 9: Crimp down the crimp tubes.
Step 10: Apply SB093 crimp covers.
Step 11: Cut off any additional Beadalon.
|